Jersey City Redevelopment

Jersey City Drum Dumpsite

Project overview

The project consisted of the clean up of an 2+ acre site located at the south end of Monmouth Street in Jersey City, New Jersey. Work consisted of the excavation and disposal of 30,000 tons of PCB, lead and industrial contaminated soil both hazardous and non-hazardous. Disposal included five different waste streams going to multiple facilities and running concurrently. A hydro barrier system was installed to contain the shallow groundwater throughout areas of the site so that the dewatering system could draw down the water level prior to back filling. Posillico utilized odor suppressant foam in order to reduce fugitive vapors from leaving the site.

What made this job complex

Posillico utilized up to five different waste streams for disposal going to multiple facilities and ran concurrently.

How Posillico solved it

Posillico was able to handle all work simultaneously by utilizing different waste streams and multiple waste facilities.